Custom Carbon-Steel Mining Sand Castings with Oil Finish and 1000–2000h Salt-Spray Reference

Let’s define your requirement

Send a product link, drawing or short brief. We’ll work through the details with you.

  1. Confirm the specificationGrade or model, size and intended use.
  2. Define your orderQuantity, finish or configuration, and samples.
  3. Agree the quotation scopeIncluded work, key checks and delivery needs.
View the enquiry checklist
Product description
  • Size
    customized, customized
  • Surface Treatment
    oil
    Materials
    carbon steel
  • Name
    Custom Casting Service Metal Casting Sand Casting for mining
    Available Material
    Stainless Steel 304&316, Carbon Steel, Brass
  • Surface finish
    as you want
    Certificate
    ISO9001:2008
  • Anticorrosive Performance
    Salt Spray Test Reach 1000-2000 Hours.
    Production Capacity
    100Ton/month
  • Application
    Heavy Industry, Water Treatment, Healthcare, Retail Industry

Custom sand-casting work for mining includes carbon steel, with 304/316 stainless steel and brass as further material directions. Size and final finish follow customer requirements for the actual component, with oil as a surface-treatment reference to define for the selected material.

Mining component geometry and the oil/finish condition

Select the supplied material specification, controlled drawing limits and the actual oil or requested finishing method. Identify treated areas, component interfaces and working duty before agreeing the finished condition. Heavy industry, water treatment, healthcare and retail are broader component-use directions requiring their actual function and any applicable approval.

Salt-spray 1000–2000 hours for the tested condition

The anticorrosion test reference is salt spray 1000–2000 hours. Establish the actual specimen, material, surface condition, test method, conditions and acceptance criterion before assigning that range to the component. Agree the corresponding records for the selected work, without converting a test duration into a universal service lifetime. Identify the material and final surface covered by the agreed record, particularly when selecting carbon steel, stainless steel or brass.

Production allocation and ISO9001:2008 scope

The production-capacity reference is 100Ton/month, with responsible site, period, material/product mix and actual output allocation to confirm. ISO9001:2008 is a quality-system reference whose applicable current document and responsible organization/site scope need agreement where required. Establish actual inspection criteria and records, quantity and manufacturing/inspection responsibilities against the accepted material, drawing, surface and test requirements.

You Might Also Like