Automatic Slurry/Wax Mixing Machine | Investment/Lost-Wax Foundry Equipment and Process Inquiry

Let’s define your requirement

Send a product link, drawing or short brief. We’ll work through the details with you.

  1. Confirm the specificationGrade or model, size and intended use.
  2. Define your orderQuantity, finish or configuration, and samples.
  3. Agree the quotation scopeIncluded work, key checks and delivery needs.
View the enquiry checklist
Product description
  • Equipment Supply Voltage
    380V
  • machine type
    continuous casting machine
    voltage
    380V, 3 Phase, 50Hz, Customized Available
  • power(w)
    7.5KW(10.06hp)
    warranty
    1 Year
  • weight (kg)
    600

Automatic slurry-mixer and wax-mixing directions serve investment/lost-wax foundry equipment inquiries. Electrical references are 380 V, three phase, 50 Hz and 7.5 kW (10.06 hp), with customized supply available. The actual material, machine function and process stage should define the selected foundry configuration.

Slurry, wax and the continuous-casting operation

Specify which material the requested machine will handle and the actual mixing task it should perform. Define how the continuous-casting operation relates to that foundry stage, then agree the intended automatic-operation scope for the chosen material. This connects the requested function to one actual equipment configuration and the process result needed for the work.

380 V three-phase installation and customized supply

The 380 V, three-phase, 50 Hz reference accompanies customization availability for the supply configuration. Power is referenced at 7.5 kW (10.06 hp). Agree the actual electrical arrangement and installation requirements for the selected machine. Keep those requirements with the material and intended operation when defining the equipment configuration and the customized supply request.

Working volume and operating acceptance

The actual material, required working volume and automatic sequence should define the mixing/processing scope. Establish the operating conditions and acceptable result for that selected task, then connect them to the requested equipment and operation. Use the same material and function definition when agreeing operating inspection and configuration acceptance, so the investment/lost-wax foundry inquiry addresses a specific process requirement.