OEM 304/316L Stainless Pump-Housing/Cavity-Shell or Multi-Way-Valve-Manifold Silica-Sol Lost Wax Investment CNC Casting Requests

Let’s define your requirement

Send a product link, drawing or short brief. We’ll work through the details with you.

  1. Confirm the specificationGrade or model, size and intended use.
  2. Define your orderQuantity, finish or configuration, and samples.
  3. Agree the quotation scopeIncluded work, key checks and delivery needs.
View the enquiry checklist
Product description
  • Component Form
    Housing / Enclosure
    Surface Finish
    Passivated , Shot Blasted
  • Alloy Grade
    316L , 304
  • Material
    Stainless Steel 304, 316L
  • Process
    Silica Sol Lost Wax Investment Casting + CNC Machining
    Service
    Customized OEM
  • Keyword
    Multi-way Valve Manifold Casting Parts
    MOQ
    Small MOQ Acceptable
  • Lead Time
    20-25days
    Surface Finish
    Shot Blasting, Pickling, Passivation, Electropolishing
  • Inspection
    100% Dimension Inspection Before Shipment
    Packing
    Anti-rust Plastic Bag + Carton Box
  • Application
    Fluid Control, Pipeline, Sanitary Equipment, Industrial Valve

Custom OEM stainless casting requests cover pump housing/cavity-shell components and multi-way valve manifold parts. Material directions are 304 and 316L, with silica-sol lost wax investment casting and CNC machining. Select the actual component drawing and fluid-duty requirements before agreeing its manufacturing and finished acceptance.

Pump geometry or manifold arrangement

Identify the pump housing/cavity shell or multi-way manifold required for the project. Define its flow geometry and mating interfaces on the actual component drawing. Allocate cast and CNC-machined dimensional limits to those locations, with the selected stainless specification and measurement basis.

Four finish choices

Shot blasting, pickling, passivation and electropolishing are the surface-treatment directions. Choose the applicable method and areas for the selected casting, with its required final condition. Connect that finish to the material and dimensional acceptance of the actual fluid component.

Dimensional inspection before shipping

Inspection covers 100% dimensional inspection before shipping. Agree which cast and CNC-machined characteristics are checked and the methods and records used. Any leakage, pressure or other functional test needed by the project requires its own selected criteria and scope.

Fluid-control and equipment duty

Application directions include fluid control, pipeline, sanitary equipment and industrial valves. Define the actual fluid, working conditions and equipment interfaces relevant to the chosen component. Agree material/finish/contact criteria for any sanitary-service requirement and evidence for required pressure, temperature or corrosion performance. Confirm quantity and OEM responsibility with that accepted drawing, finish and inspection scope.