Custom Precision 80x100x120mm Carbon Steel Lost-Wax Investment-Cast Structural Components for Industrial Machinery

Let’s define your requirement

Send a product link, drawing or short brief. We’ll work through the details with you.

  1. Confirm the specificationGrade or model, size and intended use.
  2. Define your orderQuantity, finish or configuration, and samples.
  3. Agree the quotation scopeIncluded work, key checks and delivery needs.
View the enquiry checklist
Product description
  • Size
    80x100x120mm
  • Materials
    Carbon Steel
    Material
    Carbon Steel
  • Product Name
    Structural Component
    Casting Process
    Lost Wax Investment Casting
  • Application
    Machinery Parts
    Dimensions
    80x100x120mm
  • Net Weight
    0.8 kg
    Minimum Order
    100 Pieces
  • Production Lead Time
    8 Weeks
    Service
    Custom Casting
  • Drawing Requirements
    To Be Confirmed for Each Project

This carbon-steel structural-component direction uses lost-wax investment casting for industrial machinery parts. The size is 80x100x120 mm, with custom casting, a 100-piece minimum and drawing requirements to be confirmed for each project.

Relate the component size to the machinery assembly

Use the 80x100x120 mm size as part of the actual component definition. Identify the geometry and mating dimensions by which the structural part connects to the intended machinery assembly. This gives the casting request a specific fit purpose beyond its overall dimensions.

Define the carbon steel for the intended duty

Select the required carbon-steel grade and state the structural duty the component must address. Keep the material choice with the geometry and intended application requirements. Agree any material or structural verification needed for the project so acceptance concerns the actual ordered part.

Confirm the project drawing and finished condition

Drawing requirements are to be agreed for each project. Define the dimensions, tolerances and finished surface condition that govern the component's acceptance. Identify the surfaces and interfaces that matter to its machinery connection, keeping the drawing discussion focused on the structural item being requested.

Set the custom-casting order acceptance

Confirm the required quantity against the 100-piece minimum and agree how the finished component will be accepted. Bring the chosen carbon-steel grade, geometry, dimensional limits and project verification requirements together. This gives the industrial-machinery inquiry a clear basis for discussing the custom casting work and its completion criteria.