Hand Casting Precision Investment-Part Requests with Deburring and 0.05mm Minimum-Tolerance Reference

Let’s define your requirement

Send a product link, drawing or short brief. We’ll work through the details with you.

  1. Confirm the specificationGrade or model, size and intended use.
  2. Define your orderQuantity, finish or configuration, and samples.
  3. Agree the quotation scopeIncluded work, key checks and delivery needs.
View the enquiry checklist
Product description
  • Material
    Aluminum
  • Size
    different size
    Certification
    ISO9001
  • payment
    TT
    packing
    wooden case
  • Delivery Time
    30 days
    Surface Treatment
    Deburring
  • Min Tolerance
    0.05mm
    product type
    Hand Casting
  • Equipment
    Investment Casting

Precision investment-casting part requests include the Hand Casting designation, different sizes and deburring. Aluminum is a material direction, with stainless-steel and alloy-steel requests requiring the actual supplied material to be selected.

Confirming the Hand Casting component

Clarify the intended part designation and manufacturing work before assigning geometry or use. Select the actual material specification, component size and areas requiring deburring, then agree their finished condition.

Applying the 0.05mm minimum-tolerance reference

The minimum-tolerance reference is 0.05mm, with sign, controlled dimension, process stage and measurement basis to agree. Identify these on the component drawing so acceptance follows the relevant geometry and manufacturing work.

ISO9001 and finished-part acceptance

ISO9001 is a quality-system reference whose applicable current document, responsible organization/site and scope need confirmation where required. Define actual working duty and dimensional, surface and functional inspection criteria. Agree quantity and manufacturing/inspection responsibility against the accepted material, drawing and deburred condition.

You Might Also Like